General Information
QUALITY STANDARD
WORKSHOP EQUIPMENT
Safety regulations
SAFETY AT WORK
INFORMATION ON HAZARDS
Information on VEHICLE PROTECTION
Materials
MATERIALS SCIENCE
USE OF MATERI
IMPORTANT: Conform with safety regulations
Overview of topics
Equipment
Preparing the surface
Bonding coat
Hardening times
Subsequent treatment
1.0 Equipment
Sandpaper
CLEANING AGENT R1
NOT
IMPORTANT: Conform with safety regulations.
Overview of topics
Equipment
Expiry date of consumables
Preparation of surface
Bonding coat
Hardening times
Subsequent treatment
Disposing of adhesi
IMPORTANT: Note the following information before starting to apply
adhesive!
Country-specific safety and industrial safety regulations
Material safety data sheet of manufacturer
Processing instructions on glue cartridge
Storage
Dry at 15º- 25ºC.
Shelf life
The glue cartridge is marked with a
Necessary preliminary work
Remove left INJECTION PIPE.
Remove THROTTLE VALVE.
Release screws on intake plenum from above without fail before lowering
front axle.
Secure ENGINE in installation position.
Lower front axle, releasing screws on engine mount first.
Release power steering pump, i