Minimum workshop equipment requirements in order to ensure the correct and expert performance of body repairs:

The tools listed below must be used.

All repair stages:

TOOL SPECIFICATION

Body

Repair stage 1:

TOOL SPECIFICATION

Body

Repair stage 2:

TOOL SPECIFICATION

Body

Repair stage 3:

TOOL SPECIFICATION

Body

Body

IMPORTANT: In vehicles from model year 2001, higher-tensile and high-tensile steels are used in certain areas.

It is essential to check whether the spot-welding apparatus used conforms to the technical requirements of the currently recommended welding sets. Should you have any questions, please contact the country-specific Hotline.

The use of technically obsolete equipment may have serious consequences for the structure of the vehicle (e.g. in the event of a crash). In the end, this can result in safety and product liability risks which can not be calculated.

Use and restrictions:

Definition of recommendation:

All currently recommended spot welding sets comply according to the latest information with the requirements relating to reliable welding of today's and future BMW Group vehicles. A spot welding unit will loose its recommendation as soon as tests with materials and material combinations designated for future use in BMW Group vehicles return negative results (see Table Group 1). All previous application before the withdrawal of the recommendation shall remain unaffected.

DEVICE DESIGNATION CHART

Body

Body

Application options and restrictions of above devices.

VEHICLE CHART

Body

NOTE: Status October 2009

All vehicles not mentioned can be repaired with the equipment of Group 1 and Group 2.

    READ NEXT:

     Support Members

     Cover For Frame Side Member (Part Replacement Between A And B Pillar)

    Observe procedure for REPAIR STAGE 3. Read contents of BODY, GENERAL. Following new body parts are required: B-pillar with entrance Fig. 84: Identifying B-Pillar With Entrance Fig. 85: Identify

     Replacing Engine Support In Front Of Bulkhead, Left

    Observe procedure of REPAIR STAGE 3. Read CONTENTS OF BODY, GENERAL. Steel-aluminium composite construction is used on the vehicle. Observe specific procedures for OPENING ADHESIVE BONDS, BONDING ALU

    SEE MORE:

     Opening Adhesive Bonds

    1. Opening spot-weld bonds OPEN WELD SPOTS. WARNING: Extract vapors and gases. Use personal protective clothing/equipment. Heat connecting flange with a hot-air blower. Heat components to max. 250ºC object temperature. Release connection flange with chisel. Remove adhesive residue from connecti

     Indicator/warning lights- Green lights

    Turn signal Turn signal switched on. Unusually rapid flashing of the indicator light indicates that a turn signal bulb has failed. Additional information: Turn signal Parking lights Parking lights are switched on. Additional information: Parking lights/low beams Low beams Low beams are switched on

    © 2019-2024 Copyright www.bmw7g11.com