Necessary preliminary tasks
Check wheel bearings
Lift vehicle.
Check wheel with special tool 36 1 030 (measuring fixture) for lateral runout.
Fig. 1: Checking Wheel Lateral Runout Using Special T
Necessary preliminary work
Remove WHEEL
Mount wheel in balancing machine.
To avoid retooling errors, fit the wheel on the balancing machine in the same
way as it is also fitted on the car
(valve
IMPORTANT: Conform with safety regulations.
Overview of topics
Equipment
Preparing the surface
Bonding coat
Hardening times
Subsequent treatment
1.0 Equipment
Sandpaper
CLEANING AGENT R1
ADHESIVE K1
CARTRIDGE GUN
2.0 Surface preparation
For better adhesion, remove oxide film and paint
NOTE: The Service function Initial operation of Dynamic Drive must be
carried out
after:
Work on the Dynamic Drive system which involved opening hydraulic
lines
Replacement/Programming/Coding Dynamic Drive control unit (ICM - V -
High)
IMPORTANT: Adhere to the utmost cleanliness. Do not allo