BLEEDING BRAKE SYSTEM WITH DSC
Necessary preliminary work
Remove left sensor opening
Read and comply with GENERAL INFORMATION.
IMPORTANT: When replacing or repairing, observe the filling and bleed
Necessary preliminary tasks
Remove WHEELS.
Checking thickness difference:
Measure thickness difference within brake surfaces at 8 point (spread
over the circumference) with a
micrometer gauge
Necessary preliminary work
Remove left sensor opening
Read and comply with GENERAL INFORMATION.
IMPORTANT: When carrying out repairs to the brake system, follow the
procedure set out in BLEEDING
Gray steering wheel symbol:
The system is on standby.
Green steering wheel symbol:
The system is activated.
The system supports the driver
in keeping the vehicle within the
lane.
Yellow flashing steering wheel
symbol:
Lane marking driven over.
The steering wheel vibrates
where applicable.
Yellow s
NOTES ON INITIALIZING ELECTRIC SEAT ACTUATOR DRIVES
NOTE: Initialization is carried out at the adjusting switch of the
relevant seat.
In this process, the end positions of the relevant electric seat actuator
drive are recorded and stored.
An initialization must be performed:
After replacing a dr