Notes
NOTE: Carry out the work steps listed when:
Installing a new or replacement transmission.
Flushing can only be carried out with the automatic transmission removed.
Procedure
Automatic transmiss
Necessary preliminary tasks
Remove front right WHEEL ARCH TRIM.
WARNING: Danger of scalding!
Only perform this work after engine has cooled down.
IMPORTANT: Wear protective goggles and gloves.
IMPO
Controls and Control Units
Controls
The controls for the seat functions are connected depending on the seat
equipment. The controls are:
Seat-adjustment switches
Lumbar support switch
Memory buttons
Active-seat button
Active seat ventilation button
Massage function button.
Refer to the foll
Necessary preliminary work
Remove left INJECTION PIPE.
Remove THROTTLE VALVE
Release screws on intake plenum from above without fail before lowering
front axle.
Secure ENGINE in installation position.
Lower front axle, releasing screws on engine mount first.
Release power steering pump, if