Notes
NOTE: Carry out the work steps listed when:
Installing a new or replacement transmission.
Flushing can only be carried out with the automatic transmission removed.
Procedure
Automatic transmiss
Necessary preliminary tasks
Remove front right WHEEL ARCH TRIM.
WARNING: Danger of scalding!
Only perform this work after engine has cooled down.
IMPORTANT: Wear protective goggles and gloves.
IMPO
REMOVING AND INSTALLING/RENEWING ROCKER ARMS ON RIGHT SIDE (N63)
Necessary preliminary work
(cylinder bank 1 to 4)
Remove INLET AND EXHAUST ADJUSTMENT UNIT on right side.
Remove right INLET CAMSHAFT.
Remove right EXHAUST CAMSHAFT.
IMPORTANT: Used rocker arms (1) may only be reused in the same p
Replacing Front Left Or Right Side Wall Holder
NOTE: Read CONTENTS OF BODY, GENERAL.
Side wall removed.
Transfer the systematic diagram onto the respective holder version.
NOTE: Observe REPAIR STAGE 2.
The following new body parts are required (refer to BMW Electronic Parts
Catalogue):
Holder,