A vehicle battery is constructed for the installation location and the
individual power requirements of the
particular vehicle. These individual power requirements depend on the
motorization and dif
NOTE: Red symbol for pre-delivery check
The vehicle is coded at the end of the assembly line so that the red symbol
for the pre-delivery check is shown
in the Next Service display (same symbol as veh
NOTE: Do not connect the charger to the 12 V charging socket.
The 12 V charging socket is supplied with voltage by the rear power
distribution box via relay. This relay drops
out after terminal 15 OF
REMOVING AND INSTALLING/REPLACING ALL VALVES (N63)
Necessary preliminary work
Remove LEFT CYLINDER HEAD.
Remove RIGHT CYLINDER HEAD.
Remove camshafts.
Mount cylinder head (1) on special tool 11 9 000.
Fig. 284: Mounting Cylinder Head On Special Tool 11 9 000
Prepare special tool 11 9 008 on s
Checking
Switch off the compressor.
Read the tire inflation pressure on the tire
pressure gage.
To continue the trip, a tire inflation pressure of at
least 2 bar must be reached.
Removing and stowing the sealant
container
Unscrew the filling hose of the sealant container
from the tire