A vehicle battery is constructed for the installation location and the
individual power requirements of the
particular vehicle. These individual power requirements depend on the
motorization and dif
NOTE: Red symbol for pre-delivery check
The vehicle is coded at the end of the assembly line so that the red symbol
for the pre-delivery check is shown
in the Next Service display (same symbol as veh
NOTE: Do not connect the charger to the 12 V charging socket.
The 12 V charging socket is supplied with voltage by the rear power
distribution box via relay. This relay drops
out after terminal 15 OF
IMPORTANT: Both trailing links must always be replaced!
Necessary preliminary work
Remove FRONT ASSEMBLY UNDERSIDE PROTECTION.
Release screws (1).
Remove front wheel arch cover (2) from bumper trim.
Installation note:
Make sure wheel arch cover is correctly positioned.
Fig. 35: Identifying Fro
Fig. 82: Identifying Blind Spot Detection System Input/Output
BLIND SPOT DETECTION SYSTEM LEGENDS
Radar sensor (SWW2)
Radar sensor (master)
Not for US
Steering column switch cluster
Footwell module
Operating unit for driver assistance systems
Integrated Chassis Management
Steering wheel mo