NOTE: The Service function Initial operation of Dynamic Drive must be
carried out
after:
Work on the Dynamic Drive system which involved opening hydraulic lines
Replacement/Programming/Coding Dyna
IMPORTANT: Read and comply with notes on PROTECTION AGAINST ELECTROSTATIC
DAMAGE (ESD PROTECTION).
Necessary preliminary tasks
Remove ignition key
Disconnect BATTERY NEGATIVE LEAD
Remove RIGHT LUG
IMPORTANT: Observe SAFETY INFORMATION for raising the vehicle
IMPORTANT: Read and comply with notes on PROTECTION AGAINST ELECTROSTATIC
DISCHARGE (ESD PROTECTION).
Unfasten plug connection (1) and dis
Necessary preliminary tasks
Remove WHEEL
Check WHEEL for lateral and radial runout
Remove TYRE from disc wheel
Remove dirt from rim well and rim flange
IMPORTANT: Disc wheels are not allowed to be repaired!
Mount disc wheel in balancing machine.
Fig. 30: Identifying Disc Wheel On Wheel Balanc
CHECKING BRAKE DISCS
Necessary preliminary tasks
Remove WHEELS.
Checking thickness difference:
Measure thickness difference within brake surfaces at 8 point (spread
over the circumference) with a
micrometer gauge
Compare measurement result with setpoint value.
Fig. 14: Measuring Thickness