BMW 7 Owners & Service Manuals

BMW 7 Series: Supercharger With Control

READ NEXT:

 Connection Diagram, Vacuum Activation (N63)

Fig. 462: Connection Diagram, Vacuum Activation (N63) Connection (1) Black to exhaust flaps. Distribute element (2), vacuum pump/vacuum reservoir (4). Vacuum line (3) black to vacuum pump. Vacuu

 Removing And Installing/Renewing Heat Shield At Top (N63)

Necessary preliminary work Remove both INTAKE FILTER HOUSINGS. Remove both control sensors. Release screws (1). Lift out holder. Fig. 468: Identifying Holder Screws Release screw (2). Tighteni

 Removing And Installing/Replacing Electric Changeover Valve On Exhaust Turbocharger, Left (N63)

Necessary preliminary work Remove left TURBOCHARGER. Release screws (1). Remove electric changeover valve. Installation note: Replace O-ring. Fig. 475: Identifying Electric Changeover Valve Scre

SEE MORE:

 Valves With Springs

REMOVING AND INSTALLING/REPLACING ALL VALVES (N63) Necessary preliminary work Remove LEFT CYLINDER HEAD. Remove RIGHT CYLINDER HEAD. Remove camshafts. Mount cylinder head (1) on special tool 11 9 000. Fig. 284: Mounting Cylinder Head On Special Tool 11 9 000 Prepare special tool 11 9 008 on s

 Replacing An Upper Wishbone

NOTE: If the wishbone is detached from the rear axle support/wheel carrier, it will be necessary to carry out a wheel alignment procedure after assembly. Necessary preliminary work Remove REAR WHEEL. Shown on vehicle at rear right: Remove holders (1) from wishbone. Installation note: Replace de

© 2019-2026 Copyright www.bmw7g11.com