BMW 7 Owners & Service Manuals

BMW 7 Series: Supercharger With Control

READ NEXT:

 Connection Diagram, Vacuum Activation (N63)

Fig. 462: Connection Diagram, Vacuum Activation (N63) Connection (1) Black to exhaust flaps. Distribute element (2), vacuum pump/vacuum reservoir (4). Vacuum line (3) black to vacuum pump. Vacuu

 Removing And Installing/Renewing Heat Shield At Top (N63)

Necessary preliminary work Remove both INTAKE FILTER HOUSINGS. Remove both control sensors. Release screws (1). Lift out holder. Fig. 468: Identifying Holder Screws Release screw (2). Tighteni

 Removing And Installing/Replacing Electric Changeover Valve On Exhaust Turbocharger, Left (N63)

Necessary preliminary work Remove left TURBOCHARGER. Release screws (1). Remove electric changeover valve. Installation note: Replace O-ring. Fig. 475: Identifying Electric Changeover Valve Scre

SEE MORE:

 Checking Camshaft Timing On Right Side (N63)

Notes IMPORTANT: The timing can only be checked with special tool 11 9 900. The timing may be misinterpreted if it is checked without special tool 11 9 900. Cylinders 1-4: Necessary preliminary work Remove right CYLINDER HEAD COVER Remove FAN COWL with electric fan Remove BELT PULLEY for air co

 Notes On Handling Wiring Harnesses And Cables

The following applies in general To avoid damage, observe the following instructions: Avoid compressive and tensile loads To ensure professional repairs, perform repair work only with BMW-approved or recommended special tools and spare parts Make sure cables are laid without kinks or abrasion

© 2019-2026 Copyright www.bmw7g11.com