SEE MORE:
Necessary preliminary work
Remove PROPELLER SHAFT.
Completely fill centering bore hole (1) with viscous grease.
Drive special tool 11 1 310 with a plastic hammer into centering bore hole.
The centering bearing (1) is forced out of the propeller shaft by the pressure
on the grease filling.
If
Necessary preliminary tasks
Remove INSTRUMENT PANEL TRIM
Position of actuator drive:
OVERVIEW OF ACTUATOR DRIVES ON HEATER/AIR CONDITIONER
Release screws (1) and remove grounding cable.
Installation:
Replace screws (1).
Take off holder (2).
Fig. 61: Identifying Holder And Screws
Unclip connecto