BMW 7 Owners & Service Manuals

BMW 7 Series: Air Conditioning System

READ NEXT:

 A/C Performance Test (R 134a)

Observe the following conditions prior to the A/C performance test 1. Provision of a diagnosis system. Safeguard electrical system integrity by checking the fault memory (no faults in the fault memor

 Drawing Off, Evacuating And Filling Heating And Air Conditioning System (R 134a)

WARNING: Only persons in possession of a professional certificate of competence for the maintenance and repair of heating and air conditioning systems are authorized to carry out repair work on the

 Instructions For Handling R 134a Refrigerant

Work on the refrigerant circuit may only be carried out by experts! Avoid all contact with liquid or gaseous R 134a. Wear safety goggles and gloves when working on the refrigerant circuit. Follow S

SEE MORE:

 Removing And Installing/Replacing Front Left Or Right Seat Belt

Necessary preliminary tasks Remove trim panels for door pillar. Installation Microencapsulated screws (Loctite) must be replaced and may not be reused Screw connection must be completed within 20 minutes (start of curing) Microencapsulated screws must not be retightened Clean thread of nut

 Gap Dimensions, Body

The dimensions specified in this document are applicable at an object temperature of 20ºC. The aim of adjustment is to achieve a uniform gap. Symmetry of the gaps between left and right sides of the vehicle has top priority. The door gaps must not deviate between the front and rear gap by more

© 2019-2026 Copyright www.bmw7g11.com