Observe the following conditions prior to the A/C performance test
1. Provision of a diagnosis system. Safeguard electrical system integrity by
checking the fault memory (no
faults in the fault memor
WARNING: Only persons in possession of a professional certificate
of competence for the maintenance and repair of heating and air conditioning
systems are authorized to carry out repair work on the
Work on the refrigerant circuit may only be carried out by experts!
Avoid all contact with liquid or gaseous R 134a. Wear safety goggles and
gloves when working on the
refrigerant circuit.
Follow S
System Circuit Diagram - Roller Sun Blind
Fig. 26: Roller Sun Blind System Circuit Diagram
COMPONENTS DESCRIPTION CHART
Driver's door switch cluster
Footwell module (FRM)
Junction box electronics (JB)
Front power distribution box
Switch cluster in rear passenger's side door
Motor for roller
REMOVING AND INSTALLING/REPLACING BOTH INTAKE FILTER HOUSINGS (N63)
Necessary preliminary work
Switch off ignition.
Remove ACOUSTIC COVER
NOTE: Description for intake filter housing. Procedure on right side
identical.
Release clamps (1).
Tightening torque 13 62 9AZ.
Disconnect connector (2) a