BMW 7 Owners & Service Manuals

BMW 7 Series: Air Conditioning System

READ NEXT:

 A/C Performance Test (R 134a)

Observe the following conditions prior to the A/C performance test 1. Provision of a diagnosis system. Safeguard electrical system integrity by checking the fault memory (no faults in the fault memor

 Drawing Off, Evacuating And Filling Heating And Air Conditioning System (R 134a)

WARNING: Only persons in possession of a professional certificate of competence for the maintenance and repair of heating and air conditioning systems are authorized to carry out repair work on the

 Instructions For Handling R 134a Refrigerant

Work on the refrigerant circuit may only be carried out by experts! Avoid all contact with liquid or gaseous R 134a. Wear safety goggles and gloves when working on the refrigerant circuit. Follow S

SEE MORE:

 Checking Front And Rear Wheel For Lateral And Radial Runout

Necessary preliminary tasks Check wheel bearings Lift vehicle. Check wheel with special tool 36 1 030 (measuring fixture) for lateral runout. Fig. 1: Checking Wheel Lateral Runout Using Special Tool (36 1 030) Check wheel with special tool 36 1 030 (measuring fixture) for radial runout. Fig. 2

 Initial Operation With Test Run Of Dynamic Drive

NOTE: The Service function Initial operation of Dynamic Drive must be carried out after: Work on the Dynamic Drive system which involved opening hydraulic lines Replacement/Programming/Coding Dynamic Drive control unit (ICM - V - High) IMPORTANT: Adhere to the utmost cleanliness. Do not allo

© 2019-2026 Copyright www.bmw7g11.com