BMW 7 Series: Transmission Suspension, Autom. Transmission
REPLACING CROSS-MEMBER FOR TRANSMISSION MOUNTING (N63)
Necessary preliminary work
- Remove rear UNDERBODY PROTECTION.
- Support transmission with lifter.
Release screws (1) and (2).
Remove transmission cross member.
Tightening torque 22 32 3/4AZ.
.png)
Fig. 11: Identifying Transmission Mounting Screws
REPLACING RUBBER MOUNT FOR TRANSMISSION MOUNTING (N63)
Necessary preliminary tasks
- Remove GEARBOX CROSS MEMBER.
Release screws (1).
Remove rubber mount.
Tightening torque 22 32 2AZ.
.png)
Fig. 12: Identifying Rubber Mount Screws
READ NEXT:
A vehicle battery is constructed for the installation location and the
individual power requirements of the
particular vehicle. These individual power requirements depend on the
motorization and dif
SEE MORE:
Follow GENERAL INSTRUCTIONS ON PAINTING.
The following scopes of work are applicable to 2- and 3-coat paintwork.
Inside mirror
Fig. 9: Identifying Inside Mirror Paint Applying Areas
Outer door handle
Area specification applies to all paint stages.
Fig. 10: Identifying Outer Door Handle Paint Appl
Necessary preliminary work
Check TIMING
Remove left INLET AND EXHAUST ADJUSTMENT UNIT
Release screw (1).
NOTE: Guide rail is loose from cylinder head.
Fig. 51: Identifying Screw Of Guide Rail
Release bolts (1) at front from cylinder head.
Fig. 52: Identifying Bolt On Front Cylinder Head
Releas