BMW 7 Series: Transmission Suspension, Autom. Transmission
REPLACING CROSS-MEMBER FOR TRANSMISSION MOUNTING (N63)
Necessary preliminary work
- Remove rear UNDERBODY PROTECTION.
- Support transmission with lifter.
Release screws (1) and (2).
Remove transmission cross member.
Tightening torque 22 32 3/4AZ.
.png)
Fig. 11: Identifying Transmission Mounting Screws
REPLACING RUBBER MOUNT FOR TRANSMISSION MOUNTING (N63)
Necessary preliminary tasks
- Remove GEARBOX CROSS MEMBER.
Release screws (1).
Remove rubber mount.
Tightening torque 22 32 2AZ.
.png)
Fig. 12: Identifying Rubber Mount Screws
READ NEXT:
A vehicle battery is constructed for the installation location and the
individual power requirements of the
particular vehicle. These individual power requirements depend on the
motorization and dif
SEE MORE:
Necessary preliminary tasks
Remove LEFT HEADLIGHT
Release screws (1) on headlight.
Tightening torque 63 12 6AZ.
Remove turn indicator insert (2) from headlight (3) towards top.
Fig. 72: Identifying Headlight Screws
Disconnect plug connection (1) on turn indicator insert (2).
Fig. 73: Identify
NOTE: Red symbol for pre-delivery check
The vehicle is coded at the end of the assembly line so that the red symbol
for the pre-delivery check is shown
in the Next Service display (same symbol as vehicle check).
The symbol is a reminder to the Service staff that the pre-delivery check has
not yet