Fig. 462: Connection Diagram, Vacuum Activation (N63)
Connection (1) Black to exhaust flaps.
Distribute element (2), vacuum pump/vacuum reservoir (4).
Vacuum line (3) black to vacuum pump.
Vacuum reservoir (4) with three connections.
Connection, vacuum unit (wastegate), bank 2, cylinders 5 to
Electrical System - Operating Fluids
1.0 BATTERY
Only distilled water (available locally) is to be used when topping up the
electrolyte level.
If a new battery (delivered dry) is to be placed into service, use only battery
electrolyte ("sulfuric acid"),
available locally.
2.0 SEALANT/SUPER GLUE/C