Necessary preliminary work
Remove LEFT CYLINDER HEAD.
Remove RIGHT CYLINDER HEAD.
Remove ALL VALVES.
NOTE: Set of special tools 11 8 080 can be used for cylinder bank 1 to 4
and cylinder
bank 5
Necessary preliminary work
Check TIMING
Remove left INLET AND EXHAUST ADJUSTMENT UNIT
Release screw (1).
NOTE: Guide rail is loose from cylinder head.
Fig. 51: Identifying Screw Of Guide Rail
Rel
MANUAL EMERGENCY RELEASE OF TRANSMISSION LOCK
Manual emergency release of transmission lock from inside vehicle is not
possible with GA6HP/GA8HP gearboxes from
03/2010
From production date 04/2010 on, the transmission lock release cable is
not fitted on:
F01/F02/F03 GA6HP from production date
When replacing a body component, it is necessary to carry over the hole
pattern from the existing body to the
new component.
The following pictures are a schematic representation of carrying over the hole
pattern on the example of the
front wheel arch.
Necessary preliminary tasks
Adjust new part