Necessary preliminary work
Remove LEFT CYLINDER HEAD.
Remove RIGHT CYLINDER HEAD.
Remove ALL VALVES.
NOTE: Set of special tools 11 8 080 can be used for cylinder bank 1 to 4
and cylinder
bank 5
Necessary preliminary work
Check TIMING
Remove left INLET AND EXHAUST ADJUSTMENT UNIT
Release screw (1).
NOTE: Guide rail is loose from cylinder head.
Fig. 51: Identifying Screw Of Guide Rail
Rel
Notes
WARNING: Clamp off BATTERY NEGATIVE TERMINAL (risk of fire due to
shortcircuiting
on removal).
Electric fuel pump starts up automatically when door is opened!
Carry out installation work on fuel system only with coolant temperature
below 40ºC.
Wear protective goggles.
Wear protective glove
Vehicle features and
options
This chapter describes all standard, country-specific
and optional features offered with the series.
It also describes features and functions that are
not necessarily available in your vehicle, e.g., due
to the selected options or country versions. This
also applies to