As in all other BMW models, the operating and control concept of the new BMW
7 Series F01/F02 is based on
clear and optimum structuring of the cockpit. Fewer switches simplify logical
operation. The
The system circuit diagram for the outside temperature is displayed below.
The diagram is structured in such a way that only the control units and control
elements directly involved in the
instrumen
Instrument Cluster
The instrument cluster receives information on the wiring harness in the form
of analog and digital electrical
signals. These signals are processed and displayed in the instrument
IMPORTANT: Read and comply with notes on protection against damage from
electrostatic
damage (ESD protection).
Necessary preliminary work
Read out the fault memory of the DME control unit.
Switch off ignition.
Disconnect BATTERY EARTH LEAD.
Remove left and right INTAKE SILENCER HOUSINGS.
Remo
Comparison of CIC with CCC
The ASK system was installed in E65/E66. With the E60, ASK developed into
M-ASK and the further
developed CCC which was available as an option.
The multi-audio system controller M-ASK is the central control unit of the
information and communications
systems. The M-ASK c